Peter Perri III on What It Takes to Finance and Build Behind the Meter AI Power

Jake Corley (00:00):
A few years ago, Bear Ballard and I started this Energizing Bitcoin podcast just for fun, and I don't think either one of us anticipated that it would change our lives. AI has taken off, and like many of you, we have found ourselves right in the middle of it. But make no mistake, we're still diehard Bitcoin maxis, that hasn't changed. What has changed is the scale of the opportunity, and it's time for the show to evolve within. So we are back, we're super excited to be back, and we are just getting started. Welcome to the new Energizing AI. Welcome to Energizing AI. I am Jake Corley. I'm without my compadre, Bear Ballard. I had to do this thing solo, but on this episode, we're sitting down with Peter Perri, managing partner at Jupiter Island Capital. Peter develops behind the meter natural gas power plants for AI data centers.

(00:55):
Before that, he was an internet entrepreneur, but now he is deep in the weeds of solving the energy bottleneck AI is running into. So he's got a few different behind the meter projects in Sealy and Wharton, Texas. We're going to dive into really just how far behind the meter power developers have to go. We talk about the finance ability. We talk about some of the misconceptions. And so he's been doing this for a while, comes from the power world, so it's going to be a great conversation. You may know Peter from his Substack or from his podcast or his LinkedIn posts that go quite viral. So we're happy to have him here. This is Peter Perri. Peter, thanks for taking the time, man.

Peter Perri III (01:29):
Jake, what's going on? It's good to be here.

Jake Corley (01:31):
The question of the day, is it Yatta or is it Yoda?

Peter Perri III (01:35):
I've asked a lot of people. A lot of people love Yoda, obviously from Star Wars, but I think technically it should be Yatta because there's two Ts.

Jake Corley (01:42):
That's what I'm thinking. That's really the question of the day. So thanks for making the time. It's an awesome conference. This is like the Super Bowl for us Power Boys. I came across you through the content that you were putting out on LinkedIn, right? So game recognizes game. So I've seen the stuff that you're doing and start following your Substack. And I was like, "Well, this guy really has his fingers on what's happening in this space." And so I was like, "For the resurgence of the podcast, for us coming back as the new rebrand Energizing AI," I was like, "Let's talk about the market." And you just seem like a cool person to meet. So I'm glad we got the chance to meet. And so thanks for making the time.

Peter Perri III (02:15):
It's exciting. Energizing AI is all we do, so I'm excited to talk about it.

Jake Corley (02:20):
Tell me a little bit about what you guys are doing today and then we'll kind of dive in to your background.

Peter Perri III (02:25):
Oh, absolutely. So set up a private equity fund in 2021 to focus on power generation. Have a 15-year background in power gen. Partner of mine was 25 years investment banking, private equity. He was coming out of another company, so the time was right. We put our own personal money in and then raised money from some LPs and decided to focus on gas fired power gen. Initially, we were looking at batteries, we're looking at solar, multiple other things in the energy sector, but just felt gas fired was the opportunity and it was fortuitous because we had a friend who was selling some best systems to data centers. His revenues were a hockey stick. And I'm asking him, "Why is that?" And he's like, "These data centers use a lot more power because of AI." He told me the whole story, and I said, "Well, they're going to need gas generation then."

Jake Corley (03:09):
Nice. So you guys are placing investments into just different companies within the life cycle? Are you guys building your own projects?

Peter Perri III (03:16):
We started off saying we're going to invest with existing developers. So we backed two projects in Houston from a developer who had done gas fired for 20 years. We recently acquired those projects outright from the developer, so we own those now. And then we're citing our own projects and still fielding deal flow from other developers, but we're pretty selective with outside developer type projects.

Jake Corley (03:38):
Yeah. So you invested in those and then you took over and acquired those. What's the game plan to be long-term owner operators or do you guys focus on expanding those sites or new tenants or how does that work?

Peter Perri III (03:50):
Yeah. So our fund is development capital oriented, which means we're going to be putting in sub $10 million per project in development capital, call it not counting any equipment financing and all that other type of stuff. When you go to construction, then we're partnered with larger funds on construction debt and equity. And at that point, we primarily exit and keep a carry in the deal.

Jake Corley (04:11):
Yeah. So what's the sweet spot in terms of size? And maybe where you guys intended and where you guys actually ended up two different things because that's what's happened to us. We targeted a number and then now we're shooting much higher because the demand's just been different.

Peter Perri III (04:25):
No, for sure. So we cited these both as 1,000 megawatt peakers, which was big for a peaker at the time.

Jake Corley (04:31):
It's still big today.

Peter Perri III (04:33):
Still big, still very big. And 1,000 megawatt grid connections, we've got SGIAs on both deal, both projects. We're actually looking a little bit smaller now because what we're seeing is that a lot of the hyperscale campuses that are five, 10 gigawatts, we just think are very difficult to build out a behind the meter asset in a reliable way in those types of locations. So we're trying to find selective spots that are three to 500 megawatts for a couple of reasons. One, there's a lot of different ways to get the three to 500 megawatts of power in terms of OEM selection, in terms of equipment availability. But also, we're seeing inference start to take off and inference is very different, smaller non-contracted cash flows.

(05:17):
And we just think that there's an opportunity to build more power, dispatchable generation, that the grid was underserved in that area for the last, call it 20 plus years. I call it misallocation of capital because the government incentives really drove people to build a lot of excess wind and solar capacity. So we're thinking this is a long-term catch-up play and we're citing additional gas fired power gen sites that we can monetize with grid connections, but that ultimately may become hyperscale or inference sites as the world unfolds, let's say.

Jake Corley (05:52):
So how are you thinking about, obviously you've got islanded sites, you've got grid connected hybrid sites, and you've got completely on grid sites. How are you guys thinking about the relationship? Are you guys playing the ERCOT arbitrage game?

Peter Perri III (06:06):
So yeah, we think about it as ERCOT power prices have not signaled for people to build dispatchable gas generation at scale. Power forward curves have been down, haven't been robust. So clearly if you're a gas guy today, gas power plant, you're going to be wanting to sell to data centers. We do think that power prices can only go up as far as the grid goes because you see batch zero, you had 200 gigawatts of people that all posted 50,000 a megawatt. We thought 50,000 a megawatt was going to be a gating item and kind of have a lot of people shake out. That didn't turn out to be the case. So they got 200 gigawatts. For those that don't know, I know you know this, but all of ERCOT is not even 100 gigawatts. So I think to build that out is a 10-year process.

(06:54):
It's an enormous amount of build, an enormous amount of demand for grid connected assets. I'll admit that caught us by surprise a little bit. We didn't think that that many projects were going to make it through. So that tells you that in the short run, you're going to have more data centers be behind the meter. Now, whether three nines or five nines or whatever the nines of the day is, it's not easy or trivial to deliver that kind of reliability from a behind the meter installation. So we're going to see how that plays out as projects actually get built.

Jake Corley (07:25):
From y'all's perspective, what are you seeing as the challenges there? There's so many different directions we want to go with this, but let's start there.

Peter Perri III (07:33):
I mean, the challenge is, so the grid exists for a reason. You have a lot of different assets. You have solar, wind, BESS, you have gas, you have coal, you have nuclear, you have all these different assets and you have a grid sort of balancing that out. You have ERCOT as the balancing authority in other states. In my state, Florida, NextEra does that. They balance the grid. You have very limited outages. You're able to spread the risk. So if one asset is out of power for whatever reason, they have a reserve margin, they're able to call on other assets. That's why the grid is five nines reliable. That's why it's tested and true and why when we plug our phone in the wall, we expect to get power.

(08:14):
If you say, okay, we're going to only build one asset and that asset is essentially going to be a micro grid, you take reciprocating engines or turbines, they might be 90, 92% reliable. They have maintenance cycles. They can go down for any reasons, especially turbines can have problems with their blades, they can have extended forced outages. So now, you have to add extra equipment to the equation to cover for that. But even with that, you have these millisecond fluctuations of a data center asset that you have to be able to absorb with BESS or a flywheel or something else.

Jake Corley (08:48):
Combination of the two.

Peter Perri III (08:49):
Combination of the two. And then now, you also have the need for robust plant controls to make it all work. We are seeing different types of software be put on the data center side. Jensen's talked a lot about this where data center operators...

Peter Perri III (09:03):
... side. Jensen's talked a lot about this where data center operators have kind of made their own timetable worse by insisting on this three nines or five nines reliable power. So now, they're trying to absorb some of those load fluctuations within the data center. But long story short is that none of this stuff has really been done at scale. A lot of projects have been announced, but you're not seeing projects that have run ... Traditionally in power, something has to run entirely through a major maintenance interval before you really trust it as being valid. And this stuff is very new.

Jake Corley (09:32):
It's just early. We're in the first inning.

Peter Perri III (09:34):
We're just kind of making it up as we go along.

Jake Corley (09:36):
It's the Wild, Wild West.

Peter Perri III (09:37):
Back in the days of the internet, you'd build a website, the website would crash and people would expect that. They'd get errors, but in today's world, that never happens. And I think with this stuff, of course, there's going to be challenges in the early days and then we'll get through them. The difference being that with software and a lot of this is hardware. It's physical mechanical stuff that takes a while to deal with.

Jake Corley (09:59):
You brought up a really good point. Look with Batch 0, with the amount of load that was requested in Batch 0 alone is astonishing. And it's like if we even let in a fraction of that, grid prices are going to go up. But it really begs the question, if that's just who got in Batch 0, we're not talking about Batch 1 through infinity, and so in the context of really behind-the-meter, because we're seeing a lot of momentum. Two years ago, it was like, why is no one else doing this? This is not a thing. And you're seeing more and more projects, especially in West Texas, were popping up, which makes explaining what we do a little bit easier. But given just the amount of demand that we're going to have, and obviously, you mentioned the timeline there, could we take it from 91 gigawatts in Texas to a terawatt in Texas? Is that even feasible? You know what I mean? Or is it better for guys like you and us to just go and build our own stuff and be maybe grid-connected, maybe not, maybe be a little sovereign? I don't know.

Peter Perri III (11:09):
No, look, I think there's a place for both, and it's going to be everything. I don't think it's reasonable to build a terawatt of grid, but I think getting another 200 gigawatts online is doable within Texas. 10-year cycle, I think it's doable. But for sure in places like Texas where you have a ton of gas and a ton of land in West Texas, there's going to be behind-the-meter installations, too. I think it's going to be both.

Jake Corley (11:37):
Middle of September, Abbott comes out and new kind of moratorium, very broad kind of blanket moratorium temporarily pausing on TCEQ and a variety of other agencies until they can wrap their heads around what's coming down the pipe, particularly as it pertains to Batch 0. What are your thoughts on this whole thing? And we've made some adjustments in terms of our opinion around connection to the grid really from a sovereignty perspective, and those conversations have gotten much further along with customers than I would've anticipated, and we haven't really got as much pushback.

Peter Perri III (12:14):
Yeah, a great question. So Abbott came out with initially the audit, and that said, the signal to us was that, "Hey, we got too many applications for Batch 0. We need to figure out how to winnow this down a little bit further and slow it down." At the same time, it's a political year, and we all know about the community opposition. So I thought that was a prudent move by Governor Abbott to say, "Hey, we're not going to let ERCOT and the TSPs have egg on their face. I'm going to come out and we're going to come up with this audit concept, which will slow it down and hopefully make projects more credible. They have to bring their own generation."

(12:53):
And I think it also was initially a signal to folks that, "Hey, behind-the-meter is where it's at because this audit really affects ERCOT, it affects Batch 0." And then he comes out with the TCEQ moratorium, which I think is more worrisome because now, you really can't build behind-the-meter project if you have a moratorium on air permitting altogether. I think one of the reasons everybody came to Texas was it was viewed as a very fair permitted state.

Jake Corley (13:21):
He said Texas is open for business.

Peter Perri III (13:22):
Open for business. Yeah.

Jake Corley (13:24):
Three months ago, right?

Peter Perri III (13:25):
Yep.

Jake Corley (13:26):
And then all of a sudden, data centers are not polling very well, and it's a political year, and he wants to stay governor for another 30 years.

Peter Perri III (13:34):
Yeah, it's tough.

Jake Corley (13:35):
And he switches his tune, and we've kind of talked to our regulatory council and stuff. We think it's all just political posturing. It'll go away after the election. We'll be fine. We hope.

Peter Perri III (13:44):
We all hope.

Jake Corley (13:45):
But what's the worst that could happen though? And we have to be able to anticipate that, too.

Peter Perri III (13:49):
Yeah, it's hard to say. I mean, the last thing I am is a politician, but I can say that having worked in Texas a fair amount, we've dealt with lobbyists, with attorneys. I think we have a good feel for the state. Number one, it's a business-friendly state. It wants to continue to be. It's an oil-and-gas-centric state. You drive around Houston, and it's absolutely booming. People are going to work, they're getting shit done. Totally different vibe let's say than South Florida, which is more of like an everyone's-on-vacation kind of a vibe.

(14:21):
But no, love Texas. I understand the challenges that Abbott faces politically because this issue has sort of unified left and right from the standpoint of you have a lot of opposition on the left from traditional climate-type folks and also on the right from say conservationists, more populist folks. And so I think our industry's done a poor job of explaining the benefits of AI to the communities of-

Jake Corley (14:48):
100%. It's no different than oil and gas. And so this is just another day at the office for me. It's like my whole career, we've been demonized despite everybody taking advantage of the wonderful energy that we provide. And then now getting into AI data centers, it's the same thing all over again.

Peter Perri III (15:04):
It's tough.

Jake Corley (15:04):
But what the AI data center industry can learn is, you're exactly right, is to be able to actually fight against the FUD, which is from what we're seeing is mostly being pushed by Chinese funders and stuff and part of this AI soft war. But even my wife, she was like, "Well, aren't all the data centers just consuming all of our water?" And I'm like, "Oh my God, here we go again." If I don't have to answer that question 10 times a day normally, then I got to answer at home, too. So it just goes to show how prevalent this narrative is gotten out of hand, but nobody's complaining about using ChatGPT or using Claude or using any of the other technology they use that use whether regular servers or AI.

Peter Perri III (15:45):
So I was on a panel at Yotta and this came up with the group on the panel, and I think it was Ian Black had a great comment. He was on the panel as well, basically said, "Look, in traditional industrialization, the folks that were creating the disruption were also creating new jobs at the same time." And I think a lot of us in the AI sector, I really consider myself in the power sector, but on the AI side of the equation, it's hey, for the last year, it was AI is going to take a lot of the jobs. And then the rebuttal to that was, but it's also going to create a lot of new jobs, but those jobs have not really been defined yet. And it's hard for people. It's such a step change that people can't really envision it. You think of the farm jobs that all went away, but new jobs were created, and every industrial revolution has been the same.

(16:34):
I think a lot of white-collar workers like us who are grinding behind a computer all day, we love it because it takes away the shit we hate to do, like align fonts on a PowerPoint presentation and stuff like that.

Jake Corley (16:46):
I don't think that we are meant to just sit and stare at screens all day, right?

Peter Perri III (16:48):
100% no.

Jake Corley (16:49):
But like you said, we went from all being like 95% farmers, tractor comes along, disrupts that. Everybody finds new jobs. We were totally fine. Fast-forward to today, and I think that we put so much emphasis on knowledge workers and then AI comes along and it just completely commoditizes knowledge work. But I think that what we are seeing and the best kind of guests that I have, I was literally just talking about this today, with the number of ... Just generators and turbines alone, the number of these orders that are being placed and are actually being put out there, you think about just the talent shortage of being able to maintain those alone, right?

Peter Perri III (17:28):
Huge talent shortage.

Jake Corley (17:29):
Not including every other piece of equipment that we have, right? So there's going to be this massive renaissance, in my opinion, of the trades, right? And I don't think there's been enough emphasis on that. Everybody wanted to go and chase the big shiny thing and sit behind a desk and stuff. But I think we thrive, man, I think we thrive working with our hands and getting out there and doing it. And these are great-paying jobs.

Peter Perri III (17:52):
Totally true.

Jake Corley (17:53):
Welders and people who are laying concrete and engineers, there's so many jobs that we need to be able to support this infrastructure boom. This is the largest infrastructure boom in-

Jake Corley (18:03):
... to be able to support this infrastructure boom. This is the largest infrastructure boom in history, in modern history, right?

Peter Perri III (18:06):
It's a huge amount of jobs. The data already says that it's creating a lot of jobs. Electricians in West Texas are making $250,000 a year. We hear that number a lot. And exactly what you say, maintaining turbine engines is hard, running power plants is hard. And maintaining any of the infrastructure, the electrical infrastructure related to the grid build out is going to be hard. And that stuff's going to take training. It's not going to be done by robots.

(18:38):
And also human flourishing. I think I agree with you; we weren't meant to sit in front of computers all day. If a lot of that BS work can turn into more relational work like it was, say, before the creation of the PC, I think whether you're working in blue collar or white collar, you're going to be happier because the BS grunt work white collar stuff, the AI is going to be able to do it. And I think that's to all of our benefit because nobody likes doing that stuff.

Jake Corley (19:04):
Yeah, 100%. Take me way back. How do we get into power? What's the history of your career here?

Peter Perri III (19:11):
Crazy story. I live in Jupiter, Florida and there's a company in Jupiter called PSM, which is Power Systems Manufacturing. Largest maker of aftermarket gas turbine parts is right there in Florida. It's now owned by Hanwha, but it was originally founded by a guy named Bob Kraft. No relation to the New England Patriots guy. And Bob was a aerospace engineer for many years at Pratt Whitney, and him and a team in the late '90s set up this... They said, "Hey, if we can do it in airplanes, we can do it on land," and they set up a shop to make internal components for gas turbines, compete directly with GE. Now, this was in the last gas turbine boom, so companies like Calpine were buying... They were actually planning to-

Jake Corley (19:59):
When was the last boom?

Peter Perri III (20:00):
In the late '90s.

Jake Corley (20:01):
Okay. What was driving that? Do you know?

Peter Perri III (20:03):
Deregulation.

Jake Corley (20:04):
Okay.

Peter Perri III (20:04):
We went from the whole grid is regulated utility to certain markets like Texas and California said, "We're going to deregulate." That drove a huge build out. That goes back to the Enron days. That was one of the reasons why Enron made so much money, and before they didn't was because power prices were through the roof out in California, places like that.

(20:25):
Anyway, Calpine was an IPP, and they couldn't get gas turbines from GE and Siemens and Mitsubishi because they were all sold out, so they said, "We're going to go build our own gas turbine ourselves. We're going to just build it ourselves." They bought PSM, and then PSM got bought. Or excuse me, Calpine went through a bankruptcy in the crash, and then Alston bought it. When Alston bought it, he just didn't want to work there anymore. He wanted to set up his own company to make something for gas turbines. And we were friends locally. Fished together, hung out together, wives knew each other. And I had previously been in digital. I owned a digital marketing company. It's one of the original, I'll call it high traffic websites in the late '90s. Then I started an e-commerce company. I had that kind of background. I didn't have-

Jake Corley (21:18):
Just out of curiosity, what kind of e-comm are we talking about?

Peter Perri III (21:21):
We sold all kind of menswear on the internet.

Jake Corley (21:25):
Okay. Nice.

Peter Perri III (21:25):
We shipped over a million orders, believe it or not. Self-contained warehouse. I did that for 10 years.

Jake Corley (21:30):
That's awesome.

Peter Perri III (21:31):
And so yeah, Bob and I were friends, and he said, "I want to..." He had been telling me about the power industry. I was getting excited about it, but I didn't know anything. And he's like, "But you know how to raise money. You're a good business guy. You know how to do marketing." I'm like, "Okay." We started a company together in 2009 called Powerphase. It makes a turbocharger for gas turbine power plants. And I really knew nothing technically and just learned as we went. Bob hired a lot of the smart guys from PSM and worked there for seven years. It was a great experience. And from there, I stayed in the power industry and then set up the company I have now as a private equity fund.

Jake Corley (22:13):
The turbochargers on the engine, was it increasing power output?

Peter Perri III (22:16):
Yeah. I'm sure you know this, gas-

Jake Corley (22:19):
I'm a car guy, so I'm thinking-

Peter Perri III (22:20):
Gas turbine is suck, squeeze, bang, blow, right?

Jake Corley (22:22):
Yeah, yeah, yeah.

Peter Perri III (22:23):
And at altitude, because it's a plane engine, it's rotating equipment at altitude, and at high temperature, it has a D rate. And the reason for that is it's missing air because the mass flow at altitude or at high temperature is too small, so it's not able to produce its name plate output.

Jake Corley (22:41):
You're throwing turbos on turbines to avoid the D rate.

Peter Perri III (22:44):
Yes. Basically what those turbos did was highly efficient cogen process to make hot air, which you inject into the gas turbine compressor discharge chamber, and then the turbine can operate at nameplate at full at capacity no matter the ambient conditions. That was it. And the category of technology is called power augmentation.

Jake Corley (23:07):
You did that for 10 years. How long ago did you set up Jupiter?

Peter Perri III (23:11):
2021. I left Powerphase in 2018, and then I did biz dev type stuff in the power industry for all the customers that I met at Powerphase. And then when my current partner was able to be available, because he had a private equity background, I said, "Hey, let's do something in energy."

Jake Corley (23:30):
Walk me through what's next for you guys? You have existing projects right now.

Peter Perri III (23:37):
We have existing projects. We're fighting like hell to get those into a financial close type situation where we've got a PPA with a hyperscaler-

Jake Corley (23:44):
Let's talk about that for a second.

Peter Perri III (23:46):
... all that stuff.

Jake Corley (23:46):
Let's talk about that.

Peter Perri III (23:47):
All right.

Jake Corley (23:49):
That is the thing that nobody seems to be talking about is that there's... We experience it, and as does everybody else. Not exclusive to us. The amount of power that people are demanding and the lack of understanding of what it takes to get a financeable deal, the bid ask here is a little shocking, to be honest with you.

Peter Perri III (24:06):
It's pretty big. Yeah.

Jake Corley (24:07):
What are you seeing? And then I'll provide some commentary on what I'm seeing.

Peter Perri III (24:12):
No. When you're building a billion dollar plus asset, obviously the folks that are going to put that money in are what you would call infrastructure equity and lenders. And particularly the lenders are very risk-adverse because they aren't making that much money. They're making some amount plus over SOFR. They can't lose money in a deal. They're putting out a lot of money.

(24:32):
I think a lot of the folks in the data center world, just because of the California roots, they're coming from a venture capital mentality. Financial close on a power asset or on a pipeline asset or other types of energy assets don't have to be mostly de-risked, they have to be 100% de-risked. There's a list of 1,000 things, let's say, and they all have to be done. If 999 of them are done, you're not getting the money. And I think that disconnect between venture capital mentality and infra mentality is where that... Exactly what you talked about, the gulf in between, hey, we need more power, and we can pay for it versus this thing is financeable. To be financeable, number one, you need a revenue strategy. Either you're getting-

Jake Corley (25:18):
You need revenue, period. That's a good start.

Peter Perri III (25:21):
Revenue's a good start.

Jake Corley (25:22):
Revenue's usually a good start because the bank's like, "How the hell are we going to get paid?"

Peter Perri III (25:24):
Well, so the things we talked about, you either have a grid-connected power plant or you have a behind the meter power plant. If it's a grid-connected power plant in Texas, merchant prices are not financeable, so being able to just be a price taker of the grid price is not financeable today. It has been in the past, but grid prices have not been great. And so for maybe the last 20 years, you really couldn't finance a power plant just off of merchant. That means you have to go out and get a long-term agreement from, we call them hedging counterparties to be able to fix the amount of price that you're making on a KW month from power, from the power plant. That's a grid connected asset. You need to have that.

(26:05):
If it's behind the meter, you're going to have to have a PPA because there's no other way to monetize the power. That agreement's going to have to be 10 or 15 years. It's going to have to generate called a levered return in the upper teens at minimum for the project. And the counter party's going to have to be credit worthy in order to do that deal. If-

Jake Corley (26:23):
That's the hard part is lenders, the first question is are they investment grade?

Peter Perri III (26:27):
Are they investment grade?

Jake Corley (26:28):
People don't realize how small that TAM is, investment grade or rated, but it's still a very, very small TAM. And so the alternative is if you're not investment grade, we've got to get some sort of either backstop or credit wrapper. There's a variety of different ways that these deals are getting done, but effectively that's... It's like going and co-signing when you're young on a car with your parent. You bring your parent along, except in this instance, your parent is Nvidia or AMD or somebody with a great balance sheet with great credit that ultimately says-

Jake Corley (27:03):
... somebody with a great balance sheet, with great credit that ultimately says, "If you as a business can't pay your bills, daddy's going to hop in and cover it." But the reality is, and what we're seeing in these deals is that, and you mentioned it, you nailed it, 10, 15, 20 years, we prefer longer the better, and the more financeable. But the challenge with that is now daddy's on the hook for a 20-year contract for X number of megawatts.

(27:25):
So I think if I've got my crystal ball, power is the physical bottleneck to the AI revolution. However, I think the new bottleneck, and I think we're already seeing the early innings of this, is just, it's this problem exacerbated. It's how do we get the capital and how do these companies continue to back? Look at what Anthropic's doing and OpenAI is doing. Anthropic's doing a million deals, and they're just getting backstops from everybody. How long can this go on sustainably and still be able to build at the same velocity?

Peter Perri III (28:02):
So you hit the nail on the head and I would say it isn't even a physical bottleneck at the end, it really is the financing bottleneck. And everybody's like, how did Elon pull off what he pulled off and do it so quickly? It was because he was pulling the strings on the money because his deal wouldn't have been financeable. He did, if you'll build it, they will come. He stood behind it himself with his own money, stood up the 300 megawatts of gas generation. And then he got the deal with Anthropic, which still, by the way, wouldn't be financeable because it's cancelable in a lot of different ways from what I hear.

(28:34):
So the financing is really the bottleneck here. People say it's turbines. We see turbines, as I'm sure you do, become available, we see engines become available, but you have to be able to move-

Jake Corley (28:45):
Yeah, there's a ton of allocations that hit the market, but if you can't move in under seven days, usually, is what I'm seeing, if you don't have the cash on hand to be able to move, you're not getting the allocation.

Peter Perri III (28:55):
You have to be able to move.

Jake Corley (28:56):
You can be opportunistic and you can secure a massive amount of turbines. In the last 12 months, I've seen probably two gigawatts come across my desk. But if you don't move, they're gone.

Peter Perri III (29:06):
They're gone.

Jake Corley (29:07):
But exactly, it's the financing part, man. And no one's talking about this. It's so much harder.

Peter Perri III (29:10):
That's really the bottleneck. It isn't that it's impossible, that the lead times, all the stuff that we hear about, sure, those are constraining factors, but it's really the financing mechanism to building power that slows these deals down.

Jake Corley (29:25):
Yeah. There's definitely, I think, an educational barrier with some of these younger companies raise a lot of money, huge valuation, first time building infrastructure and not really understanding how these deals get financed.

Peter Perri III (29:37):
Yeah, it's tough. You can only understand it if you've gone through it. I mean, I had people explain it to me before, and to be honest, I didn't believe them because I'm used to seeing things as barriers and figuring out how to get around it, go over it, go under it, go through it. But these are one of those things like you actually have to do it. There is no way around it, at least not today that I know of.

Jake Corley (29:58):
Part of that, this is the wild, wild west, man. This is the new gold rush, and we are all just figuring it out.

Peter Perri III (30:06):
Yeah.

Jake Corley (30:07):
There's certain things about power that stay the same, there's certain things about power in the context of AI that change. It's crazy. It's crazy. Who would've thought? Who would've thought the demand would be what it is? And I still feel like that's conservative based on where everything is kind of going.

Peter Perri III (30:22):
I totally agree. And we saw it coming, but we would never have predicted it would be to the extent that it is.

Jake Corley (30:28):
But it's exciting though.

Peter Perri III (30:29):
It is exciting. And even the guys inside the OEMs who we had relationships with who we're talking to about this, even as the middle of last year, not even they saw it coming to this extent.

Jake Corley (30:41):
Yeah.

Peter Perri III (30:41):
So it has been crazy. It took everybody by surprise.

Jake Corley (30:44):
Is there anything else that no one else is talking about that you're seeing? I'm trying to think of a last little nugget in closing.

Peter Perri III (30:50):
No, last little nugget. I mean, so I'll bring up something that we talked to on our panel today, which is, so there's a huge gulf... You talked about gulf and expectations. You've got a guy I had on our podcast, Hans Royal, talking about compute heat rate, which is how much will a data center, how much could they pay per megawatt hour before they'll curtail? And he had it up at around $5,000 a megawatt hour, which is a staggering number. And so now it's obviously there's a lot of value capture all along the value chain, but the point is a megawatt hour is worth a lot of money to a data center, to a training or one of these high performance compute data centers. The power prices, the forward curves are just not there.

(31:39):
So let's say that price is $50 a megawatt hour. You've got a gap between 50 and 5,000. The truth is somewhere in the middle. But I can build power plants all day if it's $100 a megawatt hour, but it's at 50, so that's why the grid is not really signaling folks to build new power assets. And it's just not a lot of people are talking about it, have figured this out yet. As long as prices stay where they're at, stuff ain't getting built.

Jake Corley (32:06):
Yeah. I do think one of the positive things that I'm seeing, or I think it would be a positive thing, and hopefully it's not too much dumb money, but we are seeing a significant amount of new capital coming into this space and everybody wants exposure to it. The question is, do they want exposure to data centers, to the chips themselves, the compute, or the power layer? And so we're seeing a ton of new people kind of entering the space. I think that comes with its own challenges. There's a little bit of an educational barrier sometimes.

Peter Perri III (32:33):
For sure.

Jake Corley (32:33):
Particularly as it pertains to power, but I do think that's probably a net positive. It hopefully alleviates some of these financing issues.

Peter Perri III (32:40):
Capital formation is a big thing. I was talking to a developer today that said that they were able to get financing around an interconnection agreement. A lot of people were able to get financing around the $50,000 a megawatt payment that had to be made for batch zero. So those kind of weird pockets of capital that don't necessarily fit with traditional venture or PE, you're starting to see those form up. Another pocket that's highly needed, if anybody's watching out there with pools of capital, is second lien financing against equipment and long lead items because it takes longer to get a gas turbine than it does to develop an entire power asset, so you've got to have that money out there for a while. The first lien money's there, but let's say 500 million of equipment, you need 100 million in equity to have that be out there. That pocket of capital is second lien. That's hard money to get.

Jake Corley (33:32):
Have you guys done any CRAs?

Peter Perri III (33:35):
We've heard of CRAs. We haven't done any, but I think absolutely that is a way you can do it.

Jake Corley (33:41):
So for anybody listening to what a CRA is, and we didn't know what a CRA was until not long ago, cost reimbursement agreement. So it's effectively a mechanism to be able to front run some of these long lean items and the bank goes and front runs that, purchase the orders, which gives you more confidence in an RFS window. And then if they're not investment grade, the counterparty is posting some sort of collateral so the bank knows that they're going to be made whole in the event that the CRA doesn't turn to a PPA, but 9 times out of 10 it will. But if they don't, then they get the equipment and that's kind of the risk you run with.

Peter Perri III (34:16):
We should discuss offline.

Jake Corley (34:17):
Yeah.

Peter Perri III (34:18):
Definitely looking at that. The only ones we've heard of were done directly by hyperscalers, but if there's intermediaries like banks that are getting involved, that's good to know.

Jake Corley (34:27):
Yeah. We can talk about some of the secret sauce offline.

Peter Perri III (34:29):
All right. Sounds good.

Jake Corley (34:31):
Peter, this has been great, man. Thanks for making the time.

Peter Perri III (34:32):
Jake, it's been awesome. Thank you.

Jake Corley (34:33):
Absolutely, man. Take care.

(34:34):
All right. That was Peter Perri with Jupiter Island Capital. I hope you enjoyed the episode. So if you're working in this space, leave us a like, leave us a rating, leave us a review. Share this with your friends. If you love compute, you love power. If you have any requests for guests, let us know. Up next, we've got Sean Farney who leads kind of hyperscaler data center developments for JLL. Turns out that's like a 250-year-old company. Didn't know that was a thing. Super cool. It's going to be a great conversation, so check it out next time.

(35:04):
So once again, I'm Jake Corley. This Energizing AI. We'll catch you guys in the next episode.

Creators and Guests

Jake Corley
Host
Jake Corley
Entrepreneur. Building the Future of Energy. Cohost of the Energizing Bitcoin Podcast
Justin Ballard
Host
Justin Ballard
Dad to two rockstars, General Counsel at Adakon Energy Solutions and Founding Partner at Firm 21m, THE Bitcoin only law firm. Tweets are not legal advice.
Peter Perri III on What It Takes to Finance and Build Behind the Meter AI Power
Broadcast by